SAINT RAPHAEL PIER EXTENSION

SAINT RAPHAEL PIER EXTENSION Aesthetic/structural raising of the main pier Yacht area of St. Raphael Harbor. Each ashlar, out...

STAIRWELL LIFT – MORETTA (CN)

STAIRWELL LIFT – MORETTA (CN) Anti-seismic structural lift shaft produced in 20 working days and installed in 8 days....

MUGELLO CIRCUIT GRANDSTAND

MUGELLO CIRCUIT GRANDSTAND Alcos entirely designed and built the double grandstands on the Mugello circuit straight, the fastest track...

CUSTOMISED STAIR RAMPS

CUSTOMISED STAIR RAMPS Over the years, Alcos has become a leading manufacturer of customised straight and helical staircase ramps...

BARDELLO BRIDGE

BARDELLO BRIDGE 220 m long motorway bridge consisting of post-and-beam girders with 47 m spans. Produced in less than...

LIFT SHAFT – SAN PIETRO MOSEZZO (NO)

LIFT SHAFT – SAN PIETRO MOSEZZO (NO) Twin lift shafts for a major logistics hub. The compartments in question...

PALAHOKEY TORINO

PALAHOKEY TORINO Among the many earthquake-proof grandstands built by Alcos, the Palahokey in Turin is certainly a highly prestigious...

LIFT STAIRS – SERRAVALLE SCRIVIA (AL)

LIFT STAIRS – SERRAVALLE SCRIVIA (AL) Alcos has been building all the lift stairwells of the Serravalle outlet extensions...

Stairwell – Genova

Stairwell – Genova Anti-seismic compartment made with shear connected ashlar walls. Net height from support height: 28.15 m

Multi-storey building – Cavezzo (MO)

Multi-storey building – Cavezzo (MO) Totally prefabricated structure made with three-storey pillars and steel support shelves.